COMMODITY
Copper and Zinc
CLIENT
Lundin Mining, ZEP
LOCATION
Lisbon Portugal
PROJECT TYPE
Santa Barbara Shaft Upgrade
PROJECT SCOPE
Study Hoist & Shaft System
DURATION
January 2017 to 2022
Neves Corvo – Santa Barbara Shaft Upgrade
EP SCOPE OF WORK – IMPLEMENTATION
RSV USA’s scope of work involved the following:
- An evaluation of the existing hoisting and shaft system with the objective of increasing the hoisting capacity from the current 4.5 million tonnes per annum to 5.6 million tonnes per annum
- EP for the recommended equipment changes and improvements. This included the preparation of a new design criteria, detailed design, various equipment scopes of work definition and specifications, procurement, quality control and construction management and commissioning support