COMMODITY 
Platinum

CLIENT 
Anglo American Platinum

LOCATION 
Rustenburg, South Africa

PROJECT TYPE 
Studies and EPCM

PROJECT SCOPE
Concept, Pre- & Feasibility Studies and EPCM

DURATION 
2007-2015

PROJECT VALUE 
ZAR2.1 Billion

BACK TO PROJECTS

Bathopele Phase 5 Project - EPCM

The Bathopele Phase 5 Project exploited the remaining UG2 reserves at the Bathopele mine by way of extending the east and central decline shafts along with performing mining activities in the west shaft. The refined platinum production in phase 5 is expected to be 136,000oz per
annum.

RSV has been involved with the study since its inception and the feasibility study commenced and thereafter appointed as the engineering, procurement and construction management consultant.

The UG2 reef will be mined using mechanised board and pillar extraction and conveyor belt ore removal. The mine is expected to reach full production in 2018 and the estimated investment on phase 5 is US$1.23bn.

A wooden staircase with metal railing in the middle of it.
A green table with two pictures on the wall

RSV Group Logo On A Transparent Background

About
Our Expertise
Our Services
Our Experience
Contact

Linkedin

Main Office

929 N Val Vista Drive 
Suite #109, PMB #106 
Gilbert, Arizona, USA 85234 

Canadian Branch

6299 Azure Road
Richmond, British Columbia, Canada
V7C 2N8

Contact

Email: admin@rsvusa.net
Phone: 1 604-763-4437
Fax: 1 604 370-4304

Loading...
Loading...